Robot Tool Changer Specification Checklist Before Ordering
A clear tool changer specification helps a supplier identify the correct configuration and prevents missing interfaces from appearing during assembly. Use this checklist after deciding how your tooling will be changed.

1. Identify the robot and every attached tool
Provide the exact robot model and its flange drawing. List each tool that will use the changer, including adapters, gripping components, service connections and the workpiece carried during operation.
For replacement work, supply the existing robot-side and tool-side codes and clear photographs. State whether the replacement must mate with retained hardware. Treat visual resemblance as an identification clue, not proof of compatibility.
2. Document load, geometry and movement
Give the complete attached weight and the center-of-gravity location relative to the mounting interface. Include offsets, orientation changes and the intended acceleration or movement requirements.
Ask for evaluation against the specific model’s applicable force and moment ratings. ATI’s selection guidance emphasizes checking moment capacity; a payload figure alone is not a complete selection criterion.
Keep force, torque, bending moment and payload units distinct. Resolve any contradictory catalog values or configuration notes in writing before the order is finalized.
3. Confirm both mechanical interfaces
Request dimensioned drawings for the robot side, tool side and any adapter. Check bolt pattern, pilot features, fasteners, assembled height, access and clearance.
Identify which dimensions affect the robot setup and tool position. If repeatability is important, define the application requirement and ask how the proposed component’s specification is stated and measured.
4. Write a utility map
List every pneumatic or vacuum circuit with its purpose, connection size and required operating conditions. Include any other services only when the selected product configuration supports them.
For electrical connections, specify the needed signals, connector arrangement and relevant ratings. Agree the pin assignment and responsibility for cables or adapters rather than leaving those details until installation.
5. Define operation and verification
For manual changing, describe access and the intended procedure for handling and securing the tool. For automatic changing, include the docking arrangement, approach and departure paths, tool storage and required state signals.
Document how the integrated system will check readiness and respond to an incomplete exchange. Acceptance should cover the actual exchange and operating sequence under the agreed conditions. Do not assume a particular loss-of-air or loss-of-power behavior without product documentation.
6. Close the quotation with a confirmed parts list
Request an itemized quotation for robot-side units, tool-side units, adapters, utility modules, sensors, docking or storage hardware where needed, and recommended spare components. Confirm quantities and the exact configuration codes.
Record the agreed drawings, specification revision, delivery scope, lead time and open questions. Require unresolved technical items to be closed before purchasing.
Use the checklist below as a starting point for your RFQ. Attach drawings and operating information wherever a short text answer would be ambiguous.
Frequently asked questions
What is the minimum information needed for an initial RFQ?
Provide the robot model, tool drawings, total attached load, center of gravity, changing method and required utility circuits.
Can a new tool-side plate fit an existing robot-side unit?
Only if the supplier confirms the exact mating interface and configuration. Supply both unit codes and drawings.
Should the quotation include docking hardware?
If automatic exchange requires it, specify the docking arrangement and clarify whether it is included or separately supplied.
| RFQ item | Information to provide |
|---|---|
| Robot | Model and flange drawing |
| Tool load | Total mass, center of gravity, motion |
| Mounting | Both interfaces and adapter drawings |
| Utilities | Circuit purpose, connectors and ratings |
| Control | Required states and integration responsibility |
| Supply scope | Exact codes, quantities, accessories and drawings |
Technical references
These references explain general selection principles; they do not establish identical specifications or interchangeability with the products listed here.